
Dog toys
Chews, tug toys, treat dispensers, squeakers
This page shows what we are able to make — not inventory. Every category can be re-structured, re-coloured, re-packaged and tooled to your specification.
Each category here means "we can make this". The path to an order is: confirm the spec → sample → tooling → production. It is never picking from a shelf. MOQ and lead time are on every card.

Chews, tug toys, treat dispensers, squeakers

Balls, wands, puzzle feeders

Single, double and raised-stand versions

ETL / UL pathway supported

Brushes, de-shedding tools, deshedders

Raised stand, retail-ready finish

Detachable wooden lid variants

Green / white glaze program

Detachable bowl in metal frame
What you already have decides the entry point: full drawings, a physical sample, or a direction.
You already have 3D or engineering drawings. We tool, pilot and produce to your drawing, inspected against it.
You send a physical sample. We remodel, optimise the structure and engineer compliant alternatives that avoid IP risk.
Category insight, structure, appearance and packaging developed together into a shape you can own and protect.
These are standard-process ranges. Complex structures, third-party testing or peak-season capacity will extend them — your quote carries the schedule for your specific item.
| 3D modelling / design review | 3–5 business days |
| SLA / CNC physical sample | 7–15 days |
| Steel tooling | 15–25 days |
| Pilot run | 10–20 days |
| Volume production | 25–45 days |
| Inspection and shipping | 5–10 days incl. booking |
Send a reference photo, a sample, or one sentence about what you need — we will confirm the process, the route and the price.